Laserfiche WebLink
. <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Manaqement System <br />05/04/1994 Page 1 <br />�anvnveviceaa�aevaavvvrivaevvace��nv aeenvveaoen-vene=vice-aaeaceea�ae'ee�enevvveav <br />Date Ranqe :04/01/1992 - 04/30/1994 <br />CM Work Order Range :<Blank> - 8405421080229 Pattern :7401196750848 <br />Item Range :<Blank> - WW22020001 Fattern :* <br />Program ALL Function ALL Activit_� ALL <br />svavaasvavmmaeasamavvvvmvvnvevmvvaaaamavnvwasavvse¢av=¢vv¢vv�v=ecavvvev�xvamvcvvv <br />CM WORK ORDER ID: 7401196750848 Title: REPAIR 925 112TH ST <br />«DLJPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS1985V009 -- WATER SERVICE <br />Location ID: <br />Proqram 74o Function 119 Activity 675 <br />Date Completed: 04/20/1994 <br />Overall Craft: <br />Issued: 04/19/1594 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Stetus: <br />: I,abor: <br />i Craft ID <br />UL NSO <br />UL TDE1 <br />Materials: <br />ID <br />ADAP34000547 <br />11DAP34000647 <br />COUP34004647 <br />ELIA34104247 <br />PIPE34060647 <br />VALV34008748 <br />Vehicles: <br />ID <br />V2139 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: o.00 Hr. <br />Name <br />NZELSF.T, SCOTT O. <br />THOMPSON, DWAYNE E. <br />Description <br />ADAPTER 3/4" MIP 3C INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA�TITE@ <br />COUPLING 3/4" ANG MET X FIP @ <br />ELL 3/4" STREET BRASS � <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" LOCK WING IP@ <br />Descriptian <br />SVC TRUCK CHEV 86 <br />Planned Hrs Actual Hrs <br />----------- ---------- <br />aork Description: <br />----------------------------------------------- <br />MADE REPAIF RAISED METER PRV CUSTOMER SIL�E. <br />Total coet for work order 7401196750848: <br />0.00 3.00 <br />0.00 3.00 <br />Total Labor Cost: <br />Date N Used <br />-------- ----- <br />04/20/1994 4 <br />04/20/1994 1 <br />04/20/1994 1 <br />04/20/1994 2 <br />04/20/1994 4 <br />04/20/1994 1 <br />Total Material Cost: <br />Date Hours <br />04/20/1994 3.00 <br />Total Vehicle Cost: <br />-------------- <br />Coet <br />43.05 <br />41.04 <br />84.09 <br />Cost <br />32.44 <br />6.69 <br />4.27 <br />4.14 <br />1.00 <br />8.49 <br />57.03 <br />Cost <br />15.30 <br />15.30 <br />156.42 <br />