Laserfiche WebLink
PUBLIC WORKS DB10 11'2'2004 <br /> Public Works Permit PW0411-002 <br /> PERMIT <br /> Building Permit N C0411-002 <br /> PUBLIC WORKS DEPARTMENT Planning Reference N <br /> 4-'77 3200 Cedar Street <br /> Everett,WA 98201 Public Works Fee S <br /> (425)257-8810 MAY 2 2 2005 $25.00 <br /> TO POSTING GaaranleeS <br /> OWNER NAME EMCK °ROS CONST INC APPLICANT NAME <br /> AND ADDRESS 3922 87TH AVE NE AND ADDRESS: <br /> EVERETT VA 98205 <br /> PHONE 4253342790 PHONE: <br /> TAX PARCEL I.D.0 0039320020170 PROJECTADDRESS 1115 57TH ST SE #LOT 2 <br /> DESCRIPTION OF <br /> p HOUSE <br /> PROPOS'L)WORK. <br /> PERMIT CONDITIONS LOT 2 OF SHORT PLAT 1202-20-03 <br /> 1. All calls for inspection shall be made 24 hours in advance-phone(425)257-8810 <br /> 2. All work shall be performed in accordance with this permit and current City of Everett Design and Con tlruction <br /> Standards and Specifications. <br /> 3. Call Location Underground S.rvice 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424.5555 <br /> 4. Connect aide sever per City Standard #601. W <br /> 11-29-04 3:55PM as <br /> N 0411136 M <br /> EIEC 35.00 In <br /> If 0411002 O <br /> BUILD 1363.35 7 <br /> MECH 90.00 <br /> PLUMB 120.00 <br /> DRIVE 25.00 O <br /> SRCHG 4.50 <br /> N 0411022 <br /> SEWER 70.00 <br /> UTILITY 1296.00 <br /> TOTAL 3003.85 [� <br /> C HEK 30& <br /> A OM 657 {LLLL��L�L <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned ownerlapplicant hereby agrees to hold and <br /> 11h 3/0 4- save harmless the City of Everett from any and all claims for <br /> Alf roved Icr C:01ucnon Dale damages,costs,expenses,or causes of action that may arise <br /> Cl because of Installation and maintenance of the Improvement or <br /> other right-of-way use hereto applied for and further agrees to <br /> 10FON <br /> Mau notice from the City and to replace public <br /> FINAL IN ECTION <br /> Approved as Constructed Dale <br /> y- <br /> "0144',Kam Dale <br /> WORK AUTH(nn2ED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PEND THEREAFTER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGIS PROJECT OVER 90 DAYS DURATION. <br />