Laserfiche WebLink
INSPECTION REPORT <br /> AddressCL <br /> es <br /> n Contractor ff CC1— <br /> \. <br /> � Owner <br /> m Date <br /> VAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> #Q� <br /> t ICG <br /> V <br /> Inspector�LGt Date S� b <br /> TYPE OF INSPECTION REQUESTED <br /> U Temp. Elect. J Framing J Gas Piping <br /> U Footing J Drywall,Nailing J Consultation <br /> J Foundation U Shear Nailing J Groundwork <br /> J Ductwork J Grid J Strucl.Slab <br /> J Wood Stove �}tEug-F-in J Final <br /> J Masonry J Service J Insulation <br /> U Other <br /> J BLDG:Pmt.No. -*ECH:Pint.No. / <br /> U ELEC:Pmt.No._ U PLBG:Pmt. No. <br />