Laserfiche WebLink
� INSPECTION REPORT <br /> Address /—� <br /> Contractor <br /> .19 Owner <br /> Date <br /> APPROVAL U PARTIAL APPROVAL <br /> J VIOLATION U CORRECTION REQUESTED <br /> J Corrections h.red bolow MUST BE MADE before work can be approved. <br /> J Please cenlacl Inspector and arrange for appolnlmenl. <br /> J Was r.ut able to perform inspection. <br /> U CALL 259-8810 FOR REINSPECTION-24 hour nolice required <br /> A CERTIFICATE OF OCCUPANCY SHALL DE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> r <br /> Zile <br /> Date <br /> Inspects• — <br /> PE OF PECTION REOUESTE <br /> J t FraminC Gas PI ing <br /> J ng Drywall.Nailing U Canso ttabon <br /> J ountlslion J Shear Nailing J Groundwork <br /> J Ductw,tlk J Gnd J S1 uM Slab <br /> J Wood Slove J Rough�in U Final <br /> U Masonry J Service U Insulation <br /> �i J he <br /> �eLDG:Pml.No. 4 V/• J MECH:Pmt.No. <br /> J ELEC:Fall.No. U PLBG:Pml.No. <br />