Laserfiche WebLink
INSPECTION REPORT <br /> Date q 1 / Permit CCC FC)q-OZ C) <br /> Contractor: OL')'l P. t' <br /> Owner: Gcv <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground []Groundwod✓Slab []Groundwork/Slab <br /> ❑Groundwork Q Footing ❑Rough In []Rough In <br /> ❑Slab/Conduit []Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate []OK to Insulate <br /> ❑Service ❑Framing Q Roohop Unite []Water Service <br /> ❑Grounding kinsulation ❑Mechanical Final Q Medical Gas <br /> Q Ceiling Grid tf Drywall Nailing ❑Plumbing Final <br /> Q Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK Q Rool Nailing ❑Rough InBervice Hot Water Tank <br /> Q Footing drains ❑Ceiling Grid Q Refrigeration ❑Rough in <br /> Q Root drain ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHE R CONSULTATION:_ ___.._____ <br /> APPROVAL Q PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ GK FORT.C.0 ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> [] UNABLE TO PERFORM INSPECTION: . <br /> [] CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> it 04 <br /> _ _7 .000VO <br /> Inspector: Date: _ <br /> 1111101)"11111) WTOGrt.MC <br />