Laserfiche WebLink
3Z <br /> INSPECTION REPORT . <br /> ` <br /> Address 2 <br /> Contractor--(&t' C.t o"d <br /> Owner -_ <br /> Date .— �6--�- <br /> r <br /> APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved, <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. .� <br /> --0 - 1--I-LO-03— <br /> inspector <br /> s Inspector fA Date . <br /> s <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elect. J Framm J Gas Pipping <br /> J Footing J Drywall,Nailing J Consullalion <br /> J Foundation J Shear Nailing J Groundwork <br /> J Ductwork JGri J Struct.Slab <br /> J Wood Stove J�gh-in J Final <br /> J Masonry J Service J Insulation <br /> J Other <br /> J BLDG:Pmt. No. U MECH:Pmt. No. / / <br /> J ELEC:Pmt. No. PLBG:Pmt. No. 17 `'r <br />