Laserfiche WebLink
.VMI•L1lirv�., S;{; 'y'f�r_ - .fes - „ Wae;��i <br /> leoumco IIS " / 1 ' t ..` �t� ..' • : .Yfi�N; <br /> d. p �t�i, �t0 x ' : �� �. t' <br /> WrWrrr.•rr.r,•rrr >¢`Pvb�i?8 , n3Ea�t�. <br /> W!" moll IMPORTANT. DO_NUTplace checks In the two left column.,. <br /> nrr,+ i •t:r� <br /> O r2 Exposed loam Insulation shall comply as follows (S. 502.1.4.7): <br /> ❑ Protected with metal or plastic flashing,or other suitable material that extends below grade. <br /> ❑ Insulation is approved for sub-grado, :xterior use and properly installed. <br /> .> J �3Alrflow between fresh air ports and Ilia whole-house fan ensured by undercut doors/grills(VIAQ,S.302.6.4) <br /> J O raLooseflllinsulation OKif (S.502.1.4.5): <br /> ❑maximum ceiling slope not. 3 in 12 <br /> C11>30"of clear distance from top of bottom chord to underside of roof sheathing at tho roof ridge. <br /> C3 M QG mil black polyeth•rlone ground cover, shall be lapped 12"at Joints and extend to foundation wall <br /> 0 O eclearances shall meet listed minimums between Insulation and (5.502.1.4.2): <br /> o chimney ❑Non-IC rated recessed lights: 1/2"to combustables, 3"to insulation. <br /> J OAttic hatch shall be insulated to required coiling R-value and Is weatherstripped(5.502.1.4.4) <br /> J p IIService <br /> Attic access shall Have wood dam or equivalent to retain loose fill Insulation in attic(S. 502.1.4) <br /> J E3 All exterior doors (except 20 minute doors) shall be weathorstripped (S. 502.4.4). <br /> 0 O Service hot 8 cold water piping in unconditioned spa-.os shall be Insulated to R- (S. 503.11) <br /> C3 0 recirculation hot water piping in unconditioned spaces shall be insulated to Table 5-12 <br /> p p 2 nat pump thermostat shall have progamable capability(S. 503.8.3.5) <br /> OC3 2 1 oermostat provided for each HVAC system with range of 55-75' F.(heating) (S.503.8.1). <br /> O O 4 Readily accessible, automatic or Manual means provided to restrict or shut-off Heating input to <br /> cacti zone or floor during periods not requiring heal(S.503.8.3.1). <br /> O U s onlrois for backup heat prohibit simillaneous operation of Ilia primary system (S. 503.2.2(2)). <br /> O E3 a Mechanical ventilation system shall have timer,dehumidistat, or switch (VIAQ, S.302.3.1). <br /> O 0 f Mechanical ventilation ducts shall have R-4 insulation in ua.:onddicned spaces(VIAQ, S. 302.5) <br /> p p a Mechanical ventllatlor supply ducts in conditioned spaces shall have R-4 insulation (VIAQ,302.5) <br /> p p e Supply ducts shall have volume dampers,or the equivalent,to balance system(S.503.6). <br /> 0 O VESupply and return air ducts shall have scaled duct)oinls in unconditioned spaces(S. 503.10 2). <br /> O C3VAC plenums, supply, and return air ducts shall have R-8 insulation(Table 5-11, All options) <br /> E3 Olectric water heater(s) shall have (S. 504.3) : <br /> ❑separate power, or gas shut-off ❑ 1987 NAECA Lable on lank <br /> ❑noncompressiole R10 pad(unheated spaces only) ❑ Temperature setting s 120 F. <br /> O O QShowers and lavatories shall limit flow to s3.0 gallons/minute (S. 504.8.1). <br /> C3 ED a Swimming pool,(S. 504.5) shall have: <br /> ❑ readily accessible ON/OFF switch(pump, healer) ❑Pool cover ❑ Piping insulated to S. 503.- 1 <br /> 0 O OAII fireplaces (VIAQ, S. 402.3) shall have: <br /> ❑ 6 square inch combustion air supplyduct w/tight fitting damper da ectly connected to the fire box <br /> ❑ Tight filling glass or metal doors. <br /> p O c Solid fuel burning appliance(s) (VIAQ, S.402.2) shall hav:: <br /> ❑l ight fitting glass or metal doors <br /> ❑Outside combustion air source directly connected to the fire box <br /> ❑Exception: Non-direct,4"diameter, darnpered, combustion air source: allowed only for(1) new stove <br /> installations in existing homes where obslnrctionsprecludes direct combustion air,or(2) Central <br /> healing systems located in unheated spaces. <br /> O CI f Three month, etched track radon monitor, printed instructions, and information sheels shall be <br /> supplied to Ilia single lamily dwelling or first floor units of multi-lamily dwellings by the general contractor <br /> (V IAQ,S. 502.2.1), <br /> --------- ---------- <br /> WSEC Final phase requirements: <br /> Inspected by: _Date <br /> Page 6 of 6 <br />