Laserfiche WebLink
INSPECTION REPORT , <br /> &Frr Address <br /> Contractor___. CySS <br /> Owner ___ <br /> UAPPITO—VAL 1 J PARTIAL APPROVAL <br /> J CORRECTION REQUESTED <br /> Corrections listed below MUST BE MADE before work can be approved. <br /> Please .ontact Inspector and arrange for anpointment. <br /> Was not able to p9rforrn inspection. <br /> i CALL 259-9810 FOR REINSPECTION -24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspe __ —Dale <br /> TYPE OF INSPECTION REQUESTED JF <br /> J Temp.Elect. J Framing JGas Piping <br /> J Footing U Drywall. Nailing J Consultation <br /> J Foundation U Shear Nailing U Groundwork <br /> J Ductwork �11 P�rid J Slruct.Slab <br /> J Wood Stove CMough•In � / J Final <br /> J Masonry J Service V J Insulation <br /> J Other L — <br /> J BLDG:Pmt. No. _ J MECH:Pmt No. — <br /> XELEC:Pmt. No.4�_3O3S—U PLBG:P-M. No. <br /> f <br /> u <br />