Laserfiche WebLink
INSPECTION REPORT <br /> Address <br /> S�- Sri <br /> CCC//J Contractor & <br /> 3� Owner <br /> Date <br /> APPROVAL U PARTIAL APPROVAL <br /> U VIOLATION U CORRECTION REQUESTED <br /> J Correcacros listed below MUST BE MADE before work can be approved. <br /> U Please contact mspector and ann,Ve for appointment. <br /> 'J Was not able to perform inspection. <br /> O CALL 25MIC FOR REINSPECTION-24 hour slice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> n!oetlo Yale <br /> YPE OF INSPECTION REQUESTED <br /> ren, Upraminngg 'J Gas Piping <br /> J Poou Cprywall,Neifrq J Consultation <br /> J Foundation r'U Sheer Nadrtq J Groundwork <br /> 'J Ductwork U Gr d 'J Strucl.Slab <br /> J Wood Slows U Rough in J Final <br /> J Masonry U*ennce 'J Insulation <br /> ,,,,,.0 Omer _— <br /> ,LDGi Pmt.No.—'1001-/U MECH:Pm No.— -- <br /> J ELEC.Pmt.No. U PLBG:Pmt.No. — <br />