Laserfiche WebLink
PUBLIC WORKS Date 11/9/1999 j <br /> PERMIT Public Works Permit PW9911-015 <br /> Building Permit A C9911-009 <br /> PUBLIC WORKS DEPARTMENT Planning Reference e <br /> OL 3200 Cedar Street <br /> Everett,WA 98201 Public Works Fea S $ 20 00 <br /> (425)257-8810 <br /> J pCrTl^16 fEb GuaranteeS <br /> OWNER NAME WELCHS CONSTRUCTION INC APPLICANT NAME WELCHS CONSTRUCTION INC <br /> AND ADDRESS 1507 49TF1 PL SW AND ADDRESS 1507 49TH PL SW <br /> EVERETT WA 98203 EVERETT WA 98203 <br /> PRONE ( 425) 258-5000 PHONE ( 425)258-5000 <br /> TAX PARCEL I .a PROJECT ADDRESS 605 57TH ST SW <br /> DESCRIPTION OF NEW HOUSE - BASIC 2016 to�PRGPOSED WORK <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br /> 2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 hrs.before you dig. TOLL FREE NUMBER 1.800-42.1-5555 <br /> 4 . Keep city streets clean at all times. W <br /> 5 . Curb gutter and sidewalk in the plat are new and undamaged, any <br /> damage thereto shall be replaced at the discretion of the Public Works A <br /> Inspector. vI <br /> 6 . Any change in the driveway cut must be approved by the PW Inspector, MM <br /> width at prop line limited to existing aprr,n width. W <br /> 7 . Adjust water boxes to grade at end of con.7truction. <br /> 8 . Silt fences and/or other erosion control m4-?�srlres shall be installed .7 <br /> by the builder at the direction of the Public Wurks inspector. <br /> 9 . Rooftop drainage shall be discharged to the storm drainage stub Z <br /> provided to the lot. LO <br /> '' <br /> (1r^/ <br /> O <br /> 0. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> G The undersigned City ap perch from a agenda t0 hold and <br /> I I � save harmless the Gry of Everett teem any and all claims for <br /> p perved for nxa Data damages,costs,expenses.or causes of action that may arise <br /> because of Installation and maintenance of the improvement or <br /> other right-of-way use horeto Replied for and further agrees to <br /> ive sameuponnotlco from the City erW to replaca public <br /> FINAL INSPECTION da aged Ihf�Approved as Constructed Date n'' � ' ! 013 4 °I I AppllcaM Date <br /> WORK AU TH0R12ED BY THIS PERMIT MUST BE STARTED WITHIN 150 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />