Laserfiche WebLink
CLAM <br /> Plans Examiner—fill out this grazing section or attach a window schedule to this checklist. Inspector —verify window in- <br /> formation during field inspections. Include skylights, glass doors and all other glazing on this form. Use rough opening <br /> area for calculations. <br /> Size Quantity Area 1.1-Value/Manufacturer Verlflea <br /> . 65 M <br /> Total glazing area: /3�• S <br /> Tota!conditioned area: <br /> Percentage glazing: /19 .9 �/. Verified <br /> Plans Examiner—list opaque doors by type(solid core, insulated, etc.), quantity, U-value, and manufacturer. <br /> Inspector—verify door Information during field Inspection. <br /> Type/Quantity U-Value/Manufacturer Verlfled <br /> 11 +0 <br /> Signature of Building Official: <br /> Date of Final Inspection: _ I 6-91 <br />