Laserfiche WebLink
INSPECTION REPORT, - <br /> Address _ Oso J <br /> Yom'' <br /> Contractor- <br /> Owner <br /> Date. <br /> ' PPROVAL J PARTIAL APPROVAL <br /> VIOL J CORRECTION REOLIESTED , <br /> J Corrections listed below MUST BE MADE betore work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform Inspection. <br /> J CALL 259.8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> ViJ <br /> Date <br /> YPE OF INSPECTI STED <br /> J Framin J Gas Pipin <br /> 3 aN Nailing J Consult an <br /> J Grid 9 J Groundwork <br /> J Struct.Slab <br /> J So vice J Final <br /> J Service <br /> J Other J Insulation <br /> 06�BLDG:pmt. No. <br /> LJMECH:Pmt.No. <br /> J ELEC:Pmt.No. U PLBG:Pml.No. <br />