Laserfiche WebLink
0 qoo-G�4�-�L INSPECTION REPORT <br /> Address ____ --.��5 � 1 /�L. SlU <br /> Contractor_ e <br /> ,r <br /> ` Owner <br /> Date <br /> 21 PPROVAL J PARTIAL APPROVAL <br /> 00'J VIOLATION J CORRECTION REQUESTED <br /> Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TQ OCCUPANCY. <br /> Inspector Date <br /> TYPE OF INSPECTION REOUESTED <br /> J Temp. Elect. J Framing J Gas Piping <br /> J Foobn9 J Drywall, Nailing J Consultation <br /> J Foundation J Shear Nailing J Groundwork <br /> J Ductwork J Grid J Struct.Slab <br /> J Wood Stove J Rough-in ,444gal <br /> J Masonry J Service <br /> JJ <br /> Other Insulation <br /> p <br /> , TrLDG: PmI.No. d / J MECH:Pmt.No. <br /> J ELEC: Pmt.No. J PI-BG:Pmt. No. <br />