Laserfiche WebLink
EtaNS PECTION REPORT <br /> Address 1i / 7 <br /> Contractor__ <br /> 4 <br /> Owner <br /> Date JiltZ� <br /> -'APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANC`! SHALL 9E ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector <br /> TYPE OF INSPECTION REOUESTED <br /> U Temp. Elect. J Framing J Gas Piping <br /> U Footing J Orywalf,Nailing J Consultation <br /> dd+.oundation J Shear Nailing J Groundwork <br /> U Ductwork J Grid J Struct. Slab <br /> U Wood Stove J Rough-in J Final <br /> U Masonry J Service J Insulation <br /> L17 J Other <br /> U BLDG:Pmt.No. U MECH:Pmt. No. <br /> U ELEC:Pmt. No. li PLBG: Pmt.No. --__ <br />