My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
118 58TH PL SW 2016-01-01 MF Import
>
Address Records
>
58TH PL SW
>
118
>
118 58TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:40:02 AM
Creation date
4/17/2017 9:39:50 AM
Metadata
Fields
Template:
Address Document
Street Name
58TH PL SW
Street Number
118
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.n:;inrcl;ti <br /> April 19, 1993 feotci11nical. <br /> Geoem ironmemal and <br /> Geologic Services <br /> Select Homes <br /> 237 Elm Street <br /> Everett, Washington 98203 <br /> Attention: Mr. Randy Clark <br /> Building Setback Conditions <br /> Hanabrook De"clopmc:.t <br /> Divisions III and IV <br /> Everett, Washington <br /> File No. 2670-M5-RO6 <br /> The purpose of this letter is to outline reduced building setback conditions for location of <br /> homes at the tops of slopes on Divisions III and IV of the Hanabrook Development in Everett, <br /> Washington. This has been discussed with Mr. Randy Clark of Select Homes, Mr, Pat McCourt <br /> of Universal Brokerage Corporation, and Mr. Michael Crowson of W&H Pacific. <br /> We have observed no signs of instability on native slopes in Divisions III and IV. Fill <br /> slopes on Divisions III and IV were constructed with structural fill consisting of cn-site granular <br /> soils under full-time monitoring of a qualified individual from our firm. The structural fill is <br /> keyed into existing firm native soils and fill placed to achieve the final slope grades has been <br /> properly benched into existing native materials and compacted to 95 percent of MDD (maximum <br /> dry density)according to the specifications of the ASTM D-1557 test procedure. In addition, the <br /> lots are graded to slope away from the tops of slopes and all slopes have been covered wiu,jute <br /> matting and hydruseeded Lor erosion protection. <br /> In our opinion, where slopes have been placed, compacted, graded, and vegetated as <br /> described above, the minimum building setback distance can he reduced to 10 feet. The setback <br /> distance is the horizontal distance measured from the front face of the footing to th, face of the <br /> slope. It should he understood that if the setback distance is reduced to 10 feet, the risks of <br /> losing access, reducing th e design life of the foundations and having slope movement impact die <br /> house foundations are increased. <br />
The URL can be used to link to this page
Your browser does not support the video tag.