Laserfiche WebLink
FOR OFFICE USE ONLY <br /> ADDRESS. <br /> (1) BUILDING PERMIT FEE $ <br /> (A) PLAN CHECK FEE <br /> (2) PLUMBING <br /> (3) MECHANICAL _ <br /> (4) STATE SURCHARGES <br /> (A) BUILDING CODE <br /> (B) ENERGY CODE <br /> (5) DRIVEWAY PERMIT <br /> (6) WATER SERVICE TO BE PAID PRIOR TO BUILDING PERMIT ISSUANCE $ <br /> (A) TO BE DETERMINED BY BLDG. INSPECTOR INCH <br /> (B) EXIST. WATER SERVICE. APPLICATION NO. <br /> (7) STATUS OF SEWER CHARGES: <br /> BONU DISTRICT FOOTAGE <br /> N, S, E. W <br /> SYSTEMS DEVELOPMENT <br /> WATER <br /> SEWER <br /> TOTAL ORD. FEE l>CO <br /> SEWER CONNECTION CHARGES <br /> YEAR TRUNK $ <br /> LATERAL <br /> TOTAL CONNECTION CHARGES $ _ <br /> SEWER PERMIT FEE $ 70 <br /> ot/0 r' <br />