Laserfiche WebLink
e C E ' I . , <br /> COMPLIANCE <br /> NCErHiECKLIST <br /> REQUIRED <br /> INSPEcnON IMPORTANT: Please supply Informatlon In the shaded boxes and check the appropriate <br /> APPROVED circles. Disregard topics that don't des(;, 'ie your building or equipment. DO NOT place. <br /> checks In the two left columns. <br /> , <br /> p p Q Glazing/sky,ights by type Soo the Washington glazing directory <br /> No. Manufacturer Frame malarial # Layers Model # Area (Ft2) Uo value Tested? <br /> I �c <br /> Yes <br /> l I, U._ Yes O <br /> t 1, U._ Yes O <br /> j U._ Yes <br /> Il U._ Yes O <br /> U._ Yes O <br /> it ) U._ Yes O <br /> �. U._ Yes O <br /> Jin ofij 1. U._ Yes O <br /> 0 1J Single Glazing (No mora than 1%of heated floor area before doubling,S.602.72) U.-- YeS 0 <br /> Type: <br /> No: Area: X2 l ._ Yes 0 <br /> Type: <br /> No: Area X2 U._ Yes 0 <br /> t1 Untested Glazing (Use only default U values in Chanter 10,S.1006.1) <br /> Type: <br /> No: Area: <br /> U <br /> No: Area: '— <br /> Type: _ <br /> TOTAL GLAZING AREA (Add entire column) I l ) <br /> Maximum Allowed glazing area(S.602.7.1) is derived by taking the the Iota[ lazing area Ft2 • �0� <br /> of Il O] Ft2 and dividing by the total conditioned floor area of }__ L•---- <br /> Multiply this number by 100. T'Ns value can't exceed the I Ing percentage for your selected option: <br /> �s 10%(Optlonn 1)- <br /> 25%{OUptlon V27e (Option 11)5 30% ion V I) (Options III,IV,V) <br /> is <br /> C7 p EDDocumentation Insufficient, U-values shall be justified by Mir.testing report. <br /> 0 [❑ ra Glazing air leakage(S. 502.4.3 (c)) measures shall be met as follows <br /> ❑ fixed site built: stops with sealant. <br /> ❑ operating site built:weatherstripped with closer <br /> O O rs Concealed Insulation shall be placed: ❑ behind shower/tub ❑ behind partition studs/comer <br /> r j p rs Standard air leakage (S. 502.4.3) caulking is complete and installed in the following locations <br /> J1) between Sole plate/subfloors 4) partition stud penetrations <br /> 2) wiring/plumbing/duct register penetrations 5) light fixture/flue penetrations <br /> 6 around window and door V- <br /> 3) rim joists/mud sills (heated lower Moors) ) Page 3 of 6 <br />