Laserfiche WebLink
7 <br /> CONTENTS <br /> Page <br /> Executive Summary 1 <br /> Introduction and Background 7 <br /> History 7 <br /> Ownership and Land Use of Project Area 9 <br /> Planning Context 11 <br /> Multiple Projects 11 <br /> Site Analysis 12 <br /> Technical Reports 12 <br /> The Master Plan 13 <br /> Introduction 13 <br /> Program 13 <br /> Public Outreach 13 <br /> The Riverfront Water Regime 13 <br /> Overview of Stream and Wetland Systems <br /> Bigelow Creek Draqinage/South Wetland Complex <br /> West Ditch Drainage/North Wetland Complex <br /> West Wetland Complex <br /> Railroad Corridor Wetlands <br /> Snohomish Riverbank <br /> Other Wetland and Shoreline Preservation, <br /> Restoration, and Enhancement Areas <br /> Stormwater Treatment <br /> The Riverfront Development Circulation System 25 <br /> Connections <br /> Fire Access <br /> Trails <br /> Parks and Public Open Space Amenities 37 <br /> Lowell Riverfront Park <br /> Public/Private Intersections <br /> 3-Acre Park <br /> Picnic Areas <br /> Interpretive Opportunities <br /> implementation 43 <br /> Schedule and Phasing 43 <br /> Early Phase Projects <br /> Later Phase Projects <br /> Project Coordination Issues 47 <br /> Permitting 47 <br /> Cost Estimates 47 <br /> AppendiX <br /> List of Technical Reports <br /> Public Amenities Master Plan Program <br /> Permit Matrix <br /> Cost Estimates <br /> • <br /> Riverfront Development Public Amenities Master Plan °1 <br /> 33 <br />