My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/03/31 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/03/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:58:42 AM
Creation date
4/17/2017 9:57:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/31/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> 3 <br /> PROJECT TITLE: X Consent COUNCIL BILL# <br /> Call for Bids for Riverfront Action Originating Department Engineering <br /> Surcharge Phase 3 Project First Reading Contact Person Tim Marks <br /> Second Reading Phone Number 257-8872 <br /> Third Reading FOR AGENDA OF Mar. 31, 2010 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Riverfront Riverfront Surcharge <br /> Schedule A& B Award <br /> 5-21-08, Riverfront <br /> Phase 2 Award 5-20-09 <br /> Amount Budgeted $3,100,000 est. <br /> Expenditure Required Account Number(s):Fund 402 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The City of Everett has entered into a Property Disposition Agreement with Oliver McMillan, LLC. The <br /> agreement requires that the City of Everett prepare the existing landfill for construction. In June of 2008,the <br /> City of Everett began construction by surcharging a portion of the landfill. In June of 2009, the second phase <br /> of the surcharge project began in which the second half of the site was surcharged. The third and final phase <br /> of the project will remove all excess surcharge material, grade the site to its final elevation and provide a <br /> working surface on the site. This work is scheduled to occur during the dry summer months and should be <br /> advertised for bids in early April. <br /> RECOMMENDATION: <br /> Authorize a Call for Bids for the Riverfront Surcharge Phase 3 Project. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.