My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/03/31 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/03/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:58:42 AM
Creation date
4/17/2017 9:57:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/31/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Public Amenities Master Plan <br /> Potential Permit Matrix <br /> Potential Permit/ Lead Trigger Design Detail Estimated Processing Comments <br /> Approval Agency Required Time <br /> FEDERAL—CORPS OF ENGINEERS(USACE) <br /> Section 404 of the USACE Placing a structure,excavating,or discharging As contained wim 9 to 18 months Requires CZM, <br /> Clean Water Act material in ALL U.S.waters,including JARPA application. Section 401 permit, <br /> Individual Permit wetlands,streams,and the river. An and 30 day public <br /> individual permit is triggered,in general,when notice. Plans should <br /> fill areas are greater than%acre. However, specifically diagram <br /> some work that is considered to be entirely activities w/in <br /> mitigation does not have a maximum fill USACE jurisdiction. <br /> threshold. <br /> The following Master Plan work could <br /> trigger this permit: <br /> • Bigelow Creek/South Wetland <br /> Complex <br /> • Walton Creek/North Wetland <br /> Complex <br /> • RR Corridor Trails and Wetland <br /> Mitigation <br /> • Riverbank Enhancements <br /> • 3-Acre Park Construction <br /> • Trail Realignments to avoid bank <br /> Instability areas that impact <br /> wetlands or drainages. <br /> • West Wetland Complex <br /> Enhancements. <br /> Section 10 of the USACE Placement of structures and discharging As contained w/in 4 months to a year, Requires CZM <br /> Rivers&Harbors material in NAVIGABLE U.S.waters, DARPA application depending on project <br /> Act including wetlands;i.e.boat docks,floats, complexity. Often <br /> buoys,etc. done concurrently with <br /> Section 404 permit <br /> The following Master Plan work could <br /> trigger this permit: <br /> • Float and piles at the 3-Acre <br /> Park. <br /> • Riverbank Enhancements <br /> FEDERAL—U.S.FISH&WILDLIFE SERVICE(USFWS)&NOAA FISHERIES SERVICE(NOAA FISHERIES) <br /> Section 7 of the USFWS Federal Nexus**and listed species. Requires specific Up to one year. **A Federal nexus <br /> Endangered Species & Application for a federal permit when a plant construction detail exists where projects <br /> Act Review NOAA or animal species may be affected that are and preparation of a require work in <br /> Fisheries suspected to be,or actually are of threatened Biological federally controlled <br /> or endangered status. Evaluation(BE). properties,work <br /> requiring federally <br /> Triggered by any federal permit or project issued permits(i.e. <br /> elements that receive federal funding(see USACE Section 10 <br /> above) and 404),and/or <br /> projects that will use <br /> federal funding. <br /> STATE—WASHINGTON STATE DEPT.OF FISH&WILDLIFE(WDFW) <br /> C-1 <br /> 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.