My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/03/31 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/03/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:58:42 AM
Creation date
4/17/2017 9:57:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/31/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Public Amenities Master Plan <br /> Preliminary Cost Estimate July 2009 <br /> Summary <br /> The following estimated costs show a range from low to high, indicating variability in project <br /> phasing implementation, and the volatility of pricing for particular materials. For instance, <br /> the low range pricing doesn't include full build-out of structures in the park, or full <br /> implementation of all environmental enhancements as shown in the master plan. <br /> Early Phase Protects Estimated Cost Range(in millions) <br /> Low High <br /> 3-Acre Park $2.6 $3.9 <br /> Railroad Corridor Enhancements $2.6 $3.6 <br /> Bigelow Creek Enhancements $5.2 $10.7 <br /> including Water Quality Improvement Facility <br /> Wetland C and Walton Creek $1.7 $4.1 <br /> Subtotal $12.1 $22.3 <br /> Later Phase Projects <br /> Riverfront Trail, Group Picnic, and $1.4 $4.1 <br /> Connections to Simpson Pad <br /> Wetland D $0.7 $0.9 <br /> Lowell Riverfront Park $2.9 $4.3 <br /> Lowell Crossing $2.8 $3.4 <br /> Subtotal $7.8 $12.7 <br /> TOTAL ALL PROJECTS $19.9 $35.0 million <br /> Page 1 of 9 <br /> 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.