Laserfiche WebLink
10 INSPECTION REPORT <br /> l <br /> i� Address <br /> Contractor..\�' -- <br /> ii <br /> Owner <br /> Date -- <br /> PPROVABS #10 J PARTIAL APPROVAL <br /> O VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE belore work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> t J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> f -- <br /> j. , <br /> s <br /> InspectorDate 4 _ <br /> TYPE OF INSPECTION REQUESTED <br /> ,�1I_�Pumap.Elect. J Framing J Gas Piping <br /> &—ounldation '�Solt f,Nailing J Consullalion <br /> J Ductwork 'J Shear Nailing J Groundwork <br /> J Wood Stove J Grid J Sliuct. Slab <br /> J Masonry j$BN1 n J Fin it <br /> � �7 Q/J Other_ce J Insulation <br /> 7 BLDG:Pml No.-6-12— 1, MECH: Pmt. No. <br /> J ELEC: Pmt.No. J PLBG:Pmt.No._ <br /> i <br /> l <br /> PY I <br />