My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/04/21 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/04/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:45:14 AM
Creation date
4/17/2017 10:44:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Casino Elevated West Tank <br /> Change Order No.2 <br /> • Change Order Effective Date:3/2/10 <br /> Bid Item#42—Overexcavation. Modify bid item#42 by deducting 176 cubic yards of <br /> Overexcavation at the unit price of$25.00/cubic yard,resulting in a$4,400.00 decrease to the contract <br /> price. <br /> Bid Item#43—Force Account. Modify bid item#43 by adding$106,426.13 to this bid item, <br /> resulting in a$106,426.13 contract price increase. <br /> Bid Item#45—Asphalt Concrete Resurface or Replacement. Modify bid item#45 by deducting <br /> 1,034 square yards of Asphalt Concrete Resurface or Replacement at the unit price of$27.00/square <br /> yards,resulting in a$27,918.00 decrease to the contract price. <br /> Bid Item#46—Curbing. Modify bid item#46 by adding 926 linear feet of Curbing at the unit price <br /> of$20.00/linear foot,resulting in an$18,520.00 contract price increase. <br /> Bid Item#47—Supply and Install 36-inch Pressure Reducing Valve. Modify bid item#47 by <br /> deducting$64,625.00 from this bid item resulting in a$64,625.00 decrease to the contract price. <br /> The result of deleting five(5)bid items and modifying ten(10)bid items as mentioned above results in <br /> an$85,018.37 decrease to the contract price. <br /> JUSTIFICATION: <br /> Deletion of the following five bid items were agreed to by both parties during the course of <br /> construction on the project. <br /> Bid Item#4—Specialized Mobilization For Dismantling Casino Standpipe. <br /> Bid Item#5—Base Bid for Dismantling and Legal Disposal of the Existing Casino Standpipe and <br /> Foundation. <br /> Bid Item#6—Special Demobilization for Dismantling Casino Standpipe. <br /> Bid Item#23—Site and Standpipe Accessories Demolition. <br /> Bid Item#39—Landscaping. <br /> The following 8 bid items were unit price bid items where quantities were estimated by the Engineer <br /> and called out in the original bid proposal. Actual installed quantities were measured and agreed upon <br /> by the parties and varied from the original bid proposal quantities as reflected on the final estimate. <br /> Those over or under run quantity amounts on these eight bid items are hereby being adjusted by this <br /> change order#2 as described in the above mentioned statements associated with each of the eight(8) <br /> particular bid items, which are also listed immediately below. <br /> Bid Item#11—Erosion Control Seeding. <br /> Bid Item#13—Permanent Security Fence. <br /> Bid Item#14—Construction Security Fence. <br /> Bid Item#19—Asphalt Paving. <br /> Bid Item#20—Concrete Paving. <br /> Bid Item#42—Overexcavation. <br /> Bid Item#45—Asphalt Concrete Resurface or Replacement. <br /> Bid Item#46—Curbing. <br /> Page 4 of 5 7 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.