My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/04/21 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/04/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:45:14 AM
Creation date
4/17/2017 10:44:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,' "� ,;4,r °t ., ��,,a,'�l�. 4 ,k .x :.s ;t acii^� '�. �;. -:"�a:5;x�.•r.....a-.;�'L•: t'.,r•1v. .. . <br /> 4�ii�, A�f � w1I <br /> �S:tt• -, a, h�N a g� ,�� -abrr �"� )4 F � u;N5t fr y i�"•°'i+ C�3 ,k"jr cue; �,5i • ' "mi .,i,. <br /> � ,1tV` y 7 ati ~ y� �^ . ',. kmr"' }x �s u E,.�4 .;x,,II4r 4 s .,. ,. <br /> u. �'a� ��--€c� Hr..t�i.6•,�t , �._ �t4, N.a-r,...x.';5� ,l,l rh � ri3'+1 . ,- �. +,.�..ra�:::xi::';.rc. r��., <br /> PROJECT TITLE: 1 <br /> Professional Services Consent COUNCIL BILL# <br /> Agreement with Murray, Smith X Action Originating Department Public Works <br /> and Associates,Inc. for First Reading Contact Person Richard Hefti <br /> engineering design services for Second Reading Phone Number (425)257-7215 <br /> Water Transmission Line 4 Third Reading FOR AGENDA OF Apr.21,2010 <br /> Phase 1 Replacement Project Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Rucker Hill- Budget Comm. 4/14/10 Location Map, Legal <br /> See Attached Project Prof. Services Agree <br /> Location Map. <br /> Amount Budgeted $3,500,000 <br /> Expenditure Required $314,348 Account Number(s): UP 3421 <br /> Budget Remaining $3,185,652 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The capital budget includes$3.5 million for the Water Transmission Line No. 4 Phase 1 Replacement <br /> Project. This segment of Water Transmission Line No.4 consists of 48-inch and 36-inch steel pipe installed <br /> in 1938 and 1959. The work under Phase 1 will consist of replacing up to 1,150 feet of 48-inch diameter <br /> steel pipe and 100 feet of 36-inch steel pipe. The 48-inch steel pipe is in poor condition and has had 3 leaks <br /> in the past 2 years. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign a Professional Services Agreement with Murray, Smith and Associates, Inc. for <br /> engineering design services for the Water Transmission Line No. 4 Phase 1 Replacement Project in the <br /> amount not to exceed$314,348. <br /> 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.