Laserfiche WebLink
INSPECTION REPORT <br /> �V EyEn Address __9a9 S� .SGJ <br /> Contractor__SCvr — <br /> a Owner _ <br /> Date <br /> PPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was riot able to perform inspection. <br /> J CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector ✓��___- Date <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elect. J F.aming J Gas Piping <br /> J Fooling J Drywall, Nailing J Consullation <br /> J Foundation J Shear Nailing J Groundwork <br /> J Ductwork J Grid J Strucl.Slab <br /> J Wood Stove J Rough-in Final <br /> J Masonry J Service "Jtlnsulation <br /> J Other _ <br /> J BLDG: Pmt.No. � �— J MECH:Pmt. No. <br /> 6fh-LEC:Pmt. No. 7 L J PLBG:Pmt. No __ <br />