My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
310 58TH ST SE 2016-01-01 MF Import
>
Address Records
>
58TH ST SE
>
310
>
310 58TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:53:56 AM
Creation date
4/17/2017 10:53:50 AM
Metadata
Fields
Template:
Address Document
Street Name
58TH ST SE
Street Number
310
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Worksroved plan dated _ <br /> 5. Connect side spw�/per City Standard #601. <br /> Conn6-ct side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> S 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> i <br /> Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3.2.6.2. Width __, Depth_, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with,La gas trap per Standard Plan #410 is <br /> required for the parking area. �� <br /> 11. Remove and replace curb, gutter and side�alk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as dir cted by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damag area must be replaced). <br /> 12. Install a Type I concrete drivewa er City of Everett Standard #307. <br /> 13. Pave driveway from the front operty line out to the street paving. <br /> 14. Contact the_ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The conXersyslem <br /> must meet with the Public Works Inspector to discuss potential drainage <br /> routing o beginning the project. <br /> 17. A sprinll is required for this building in compliance 1vJth the requirements of NFDA <br /> Stand�Ocls 13D. <br /> 18. All Axcavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> OThe o(<iner PF #%r hvvse uader.Sf4i;c1J fha7� Pirie erg' <br /> Ar {0c1,rise � (ri ,4taL t0 &_veLoP¢m '4 <br /> e, f of fhrs �roPe„>� as <br /> Sh Ar f l�Lo f. -rhe. Averse m(IS f be- e aca led in Silt 1, a eva <br /> 2 >Crnrn 41,c �rdpasud Lof Liner, Los. o� <br /> {jYeV/we Cnrrer � .SCrt6at 'r r <br /> a �1,><ure Lo: LrkeC}/ i>< ie h0ust isPLace.d %nCorrec <C/, <br />
The URL can be used to link to this page
Your browser does not support the video tag.