Laserfiche WebLink
a <br /> a <br /> i� <br /> f <br /> Y <br /> everett INSPECTION REPORT <br /> Address `� <br /> Contractor �'�'{�� ` <br /> L/ <br /> Owner <br /> Date <br /> TYPE OF INSPECTION REQUESTED <br /> C BLDG: Pmt. No. ❑ MECH: Pmt. No. <br /> ❑ ELEC: Pmt. No. 7!ePLBG: Pmt. No. A-c2 9 s <br /> ❑Temp.Elect. ❑ Framing ❑Gas Piping j <br /> ❑ Footing ❑ Drywall, Nailing ❑Consultation <br /> ❑ Foundation ❑Shear Nailing ❑Groundwork <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ough-In ❑ Final <br /> ❑ Masonry ❑Service ❑ <br /> 9 -APPRO ❑ PARTIAL APPROVAL <br /> ❑ OLATION ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact Inspector and arrange for appointment. <br /> ❑Was not able to perform Inspection. <br /> ❑CALL 259.8810 FOR REINSPECTION —24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> r A.195,5 Ad elife"El <br /> /Z>-tA D G•• <br /> Inspector Q "��`�-'� �` —Date <br /> r; <br /> a <br /> P. <br />