Laserfiche WebLink
i. <br /> TO POSTING T,� <br /> CLOSED CM WORK ORDERS REPORT <br /> UTILITIES Total Utility Maintenance Management System <br /> `` 03/04/1992 Page 1 <br /> Date Range :01/09/1989 - 03/04/1992 <br /> ,D x CM Work Order Range : 1001085420229 - 7401196770019Pattern :7401196647504 <br /> y y y Item Range :<Blank> - WVL3195Q19 Pattern :• <br /> H Program ALL - Function ALL --Activity ALL------------ -- ----------- - -- ---- <br /> "� y CM WORK ORDER ID: 7401196647504 Title: SO 702 58TH ST SE - 3/4 IN METERED <br /> O x O Item ID: -- <br /> HIV <br /> H Location ID: -- <br /> 1-3 Z Program 740 Function 119 Activity 664 <br /> Oy, Date Completed: 03/04/1992 <br /> 8 Overall Craft: <br /> Q <br /> Q. Issued: 01/16/1992 Issued by: SKL Assigned to: SKL <br /> Out of Service? NO Priority: Travel Time: 0. 00 fir. <br /> 3 Meter Reading: <br /> r+H Downtime: 0 hours <br /> gW Status: <br /> H <br /> A C V1 <br /> [q to Labor: <br /> H LIto CA Craft ID Name Planned Hours Actual Hours Cost <br /> ----- ------ ------------------------------ - <br /> ------------ ------------ ----- <br /> WSW MKC MOORE, KIM C. 0.00 4 . 00 70. 1:: <br /> UL NSO NIELSEN, SCOTT O. 0.00 4 . 00 48.40 <br /> Materials: Number <br /> ID Description Date Used ---Cost <br /> ---------------------- -------- ------ ---- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 02/12/1992 1 7 .01 <br /> ADAP36001347 ADAPTER 1" FIP X INSTA-TITE @ 02/12/1992 1 8.34 <br /> BOX000056247 BOX METEe PLA 15" X 10" W/LID 02/17/1992 1 14.099 <br /> gUSHJ4118547 BUSHING 3/4" X 1" BRASS 02/12/1992 1 <br /> 3 . 16 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 02/12/1992 1 13. 58 <br /> METE36089447 METER 5/8" TRIDENT 02/12/1992 1 25. 15 <br /> NIPP34131647 NIPPLE 3/4" X 1 1/2" BRASS 02/12/1992 1 1. 37 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 02/12/1992 15 4 . 20 <br /> SADD46018247 SERVICE SADDLE B" W/3/411 CCT 02/12/1992 1 11. 16 <br /> 45.08 <br /> SETT34033647 SETTER COP 5/81 X 3/4 LGTH1511 02/12/1992 1 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> -------------- -------- ------ --------- <br /> V2117 CHEV 1 TON 191 02/12/1992 4.00 19. 16 <br /> V3505 BACKHOE CASE 82 02/12/1992 4.00 50.28 <br /> -------------- <br /> ��� Total cost for work order 7401196647504: 321. 10 <br />