Laserfiche WebLink
INSPECTION REPORT <br /> Address . �_ � _�Z� SGC) <br /> n �,�Jy Contractor <br /> 13 <br /> Owner <br /> Date <br /> PPROVAL U PARTIAL APPROVAL <br /> J VIOLATION U CORRECTION REQUESTED <br /> J Corrections listed balow MUST BE MADE before work can be approved. <br /> J Please contact insrector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 how required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISou"i DOSTED <br /> ON THE PREMISES ORIOR TO OCCUPANCY. <br /> i <br /> Inspector L Date.Z: 9-�— <br /> F INSPECTION REQUESTED <br /> J Tern J Framing J Gas Piping <br /> U Foundation rlwall,,Nailing J Consultation <br /> ear Naiung J Groundwork <br /> U Ductwork J Grid J Struct.Slab <br /> J Wood Stove J Rough-in J Final <br /> U Masonry U Service J Insulation <br /> U Other <br /> *LDG:Pmt.No. U MECH:Pmt.No. <br /> U ELEC:Pmt.No. U PLBG:Pmt. No. <br />