Laserfiche WebLink
PU®L/t WO/MF Ilal��r <br /> �, � 1891199) <br /> PC B45010 thru 45027 <br /> January 13, 1995 <br /> Page 5 <br /> V�5. Details 3 & 5 sheet A19 do not correctly indicate the handrail extensions. Item <br /> 15 of my previous letter. <br /> J6. Detail 9/A19 does not correctly illustrate the required stair handrails. Item 13 <br /> of my previous letter. <br /> (/37. Provide attic ventilation calculations and vent specifications for each building. <br /> Sec. 3205(c). <br /> �/38. Detail 7/A20 indicates an optional construction detail. We cannot approve <br /> options for occupancy or unit separation walls. Please illustrate 21L1y the <br /> intended method of construction. <br /> 39. Please indicate which wall sections apply to which buildings. Buildings P & Q <br /> must have one hour construction and many of the wall sections do not comply. <br /> 1/0. Section 3/A20 indicates a non-rated wall. Unit separation walls must be one <br /> hour rated. <br /> 41. Slab edge insulation must extend vertically to the surface of the slab or be <br /> located on the exterior of the foundation wall. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of drawings reflecting the <br /> corrections requested. <br /> Upon submittal of the drawings, your application will be given priority and plan review <br /> will recommence. <br /> CITY OF EVEREM 3200 Cedar Street . Everett, WA 98201 • (206) 259.8800• Fax (206) 259-8856 <br />