Laserfiche WebLink
INSPECTION REPORT <br /> 2-e:)o thSt sw <br /> Contractor_R>l <br /> Owner Date— (a—15 <br /> (140-POVAL J PARTIAL APPRMIL <br /> J OLA N J CORRECTION REQUESTED <br /> J Corrections listed helow MUST BE MADE before work can be approved. i <br /> J Please contact inspector and arrange for appointment. <br /> J was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> 4 <br /> Inspector Date �— <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elect. J Framing j�Gas Piping <br /> J Footing J Drywall,Nailing JJ Consultation <br /> LI Foundation J Shear Nailing J Groundwork <br /> Ductwork J Grid J Struct.Slab <br /> J Wood Stove J Rough-in J Final <br /> J Masonry J Service a fJ�Innssulation <br /> J BLDG:Pml.No. -- &MECH:Pml. <br /> J ELEC:Pmt, No J PLBG: Pmt.No. <br />