Laserfiche WebLink
Vim <br /> INSPECTION REPORT <br /> �u - IW <br /> Address - <br /> Contractor___Cw �� \�W_O C co <br /> I� <br /> Owner --- — --—_-- <br /> Date <br /> APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J cc,reclions listed below MUST BE MADE before work can be approved. <br /> J Ple:,se contact inspector and arrange for appointment. <br /> J was not able to perform inspection. <br /> J CALL 259.0010 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Date <br /> Inspector <br /> E O INSPECTION REQUESTED <br /> J Framing J as Pi ing <br /> -IT p. EI :I_ J Drywall.Nailing J Consultation <br /> J ohng J Shear Nailing J Groundwork <br /> oundation J Grid J Struct.Slab <br /> J Ductwork J Rough-in J Final <br /> J We <br /> Stove J Service J Insulation <br /> J Masonry gJGOther <br /> V16"'DG: Pmt.No. J MECH:Pmt.No. —— <br /> J ELEC:Pml.No. —J PLBG:Pmt. No. <br />