Laserfiche WebLink
INSPECTION REPORT x <br /> AaLo)- <br /> ' thsl sw <br /> Contractor _�O <br /> OwnerCC U1 _ <br /> Date_ q_ <br /> U APPROVALPARTIAL APPHOVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> —Ala 01 <br /> Inspector oing %. Date_ <br /> TYPE OF INSPECTION REQUESTED <br /> U Temp.Elect. J Fra -j Gas Pippinp <br /> J Footing J DrywalP Nailing J Consultakpn <br /> J Foundation J Shear Nailinq -i Groundwork <br /> J Ductwork J Grid -j Struct. Slab <br /> U Wood Stove /?'Rough-in Ky^S J Final <br /> J Masonry J Service J Insulation <br /> J Other <br /> J BLDG:Pmt. No. //�� J MECH:Pmt.No. <br /> PIELEC: Pmt. No.—/_12 U PLBG:Pmt. No. <br />