Laserfiche WebLink
February 8, 1993 <br /> Washington Federal Savings <br /> Attn: Kathy <br /> PO Box 218 <br /> Bothell WA 98041 <br /> RE: Dennis H Murphy <br /> Dear Kathy, <br /> The following charges will be assessed at the time the <br /> building permit is picked up: <br /> Building 835 . 00 <br /> Plumbing 112 . 00 <br /> Mechanical 80. 00 <br /> Public Works 20. 00 <br /> State Surcharge 4 . 50 <br /> Subtotal Building Permit 1051. 50 <br /> Water meter 105. 00 <br /> Sewer-new connection permit 70. 00 <br /> Ordinance 1171-85, water only 224 . 00 <br /> TOTAL $1450. 50 <br /> The Building permit amount is based on a house valuation <br /> of $152, 065. This amount may be corrected up or down by the <br /> plans examiner. A Plan Check fee of $536 . 25 was paid at the <br /> time the plans were submitted. <br /> The above charges should remain constant except the <br /> Building fee which may change slightly up or down depending on <br /> the final house valuation given by the plans examiner. <br /> Please feel free to call me at 259-8810 if you have any <br /> further questions. <br /> Sincerely, <br /> Mollie Hughes <br /> Counter Tech <br />