Laserfiche WebLink
COMPLIANC[ 19:91 WSENESIDENTIAL COMPLIANC CHECKLIST <br /> REQUIRED <br /> INSPEC <br /> aarn(vE' IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br /> o circles. Disregard topics that don't describe your building or ectulpment. DO-NOT.place <br /> checks In the two lett columns. <br /> O Q�Glazing/skylights by type 7 See the Washington plazing direcicry <br /> No. Manufacturer Framo material # Layers Modal 4 Area (F12) Uo value Tested? <br /> U.— Yes 0 <br /> U._ Yes 0 <br /> _ U._ Yes 0 <br /> U._ Yes 0 <br /> U._ Yes 0 <br /> U._ Yes 0 <br /> _ U._ Yes 0 <br /> U._ Yes 0 <br /> U._ Yes 0 <br /> _ U— Yes 0 <br /> 1D ED io Single Glazing (No mora tian l%ol hoatod Aoor u ea bolore doablrtp,5.602.7 J 0 <br /> Type: _ No: Area: X2 ( /jr U._ Yes 0 <br /> Type: Vo' Are X2 U._ YIS 0 <br /> f� [� i1 Un(0 sled GIaZIn,J (U,e only dofauli e.vmue,h cnaomr 10,S.1006.1) <br /> Type: No: Area: N U._ <br /> Type: No: Area: U. <br /> TOTAL GLAZING AREA (Add entlra column) ('0W. ?� <br /> 'v <br /> O ED Maximum Allowed glazing arca(S,602.7.1) is derived by taking the the total glazin area <br /> of_._i�'_i>•"] _ Ft2 and div ding by the total conditioned floor area of _ �F12. <br /> Multiply this number by 100. This value can't exceed the glazing percentage for your selected option: <br /> 0 : 10%(Option 1) 0 s 129/6(0otion 11) ® s 2140(Options III,IV,V) <br /> 0 s 25%(Option VI) 0 s 30%(Option VII) <br /> 0 L1 ra Documentation Insufficient, LI-values sliall be justified by Mfr.testing report. <br /> re Glazing air leakage(S. 502.4.3 (c)) measures shall be, met as follows <br /> Cl fixed site built: slops with sealant. <br /> ❑ operating site built:weatherstripped with closer <br /> O rs Concealed Insulation shall be placed: ❑ behind shower .ub ❑ behind partition studs/corner <br /> O rc Sivndard air leakage (S. 502.4.3) caulking is complete and installed in the following locations : <br /> i) between Sole plale.rsubfloors 4) partilicn stud penetrations <br /> 2) wiririg rplumbing/duct register penetrations 5) light fixture/flue penetrations <br /> 3) rim joists/mud sills (healed lower floors) 6) around window and door f,---,- <br /> Page 3 of 6 <br />