Laserfiche WebLink
COMPLIANCE <br /> REQUIRED <br /> i <br /> INSPECTION <br /> nrraov[o� IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br /> circles. Disregard topics that don't describe your building or equipment.DO_NOI place <br /> Checks in the two left columns. <br /> ❑ ❑ ©EMerlor slab Insulation, Nnot located on the interior, shall be R-10 (Table 6-2). <br /> ❑ ❑ V-71 Extorlor slab Insulation, i1 present, shall aporoved for below grade use and protected above grade. <br /> ❑ E)Wails, including rim joists, shall be insulated without compression to (Table 6.2): <br /> QR-15 batt (Options 1,11) ®R-19 (Option III, IV,V, VI,VII) <br /> ❑ ❑ E)Intorlor below grade walls shall be insulated without compression to (Table 6.2): <br /> OR' <br /> -15 (Options I, II) OR.19 (Options ill, IV, V,VI,VII) <br /> eo <br /> ❑ ❑ Vaulted callings shall to Insulated without compression to R-30(Table 6-2, All options) <br /> ❑ ❑ Q Skylight wall Insulation is installed and equivalent to the required wall R-values above <br /> ❑ C2Vapor retarders shall be Insta!led toward the warm surface as represented below(502,1.6): <br /> Selecl one Oplion for floors, walls, and appropriata I callings:Floors: y(•a <br /> Plywood W✓exterior glue Poly <br /> Walls: Poly plastic(z4 Mil Q Face-,tap1 MII) ® backed bads <br /> Face-stapled, backed belts ®PVA paint <br /> Ceilings: Not required where ventilation space averages >12"above insulation, <br /> Facc stapled backed balls QPOIy plastic (a 4 mil) Q PVA paint <br /> aint <br /> ❑ s Heating system efficiency and sizing requirements shall be mat as represented below; <br /> ❑ ❑ �e Heat Pump efficiency shall be mot undei the followicg compliance path{S.503,4): <br /> Q 3Pill system, air source heat pump:IiSPF a 6.6,COP>3.0 <br /> Q Single package, air source heat pump:HSPF a 6.6, COP> 3.0 <br /> Q Water source heat pump:COPi 3.8 <br /> Q Ground source heat pump COP a 3.0 <br /> ❑ Q Central force-air furnace AFUE rating,as listed in the G f.1A Directory,shall be: <br /> ®i .78 (Options 1, Il, IV,VI, VII) Q z ,80 (Option dip <br /> ❑ ❑ Q1c Non•central,combustion heating systems shall have informi,e Q 74 (Option V} <br /> ❑ ❑ ignition p7lMaximum heating system output (150%of design heat load) is S _6 <br /> ❑ ED] s�s High efficiency forced-air furnace (; 56,000 BTU/hr.oulpugmay may exceed 150%os DHL2 2) <br /> because: QGAMA listed AFUE is a 78 a I par each 5000 BTU/hr output(hal it exceeds file DHL, <br /> WSEC Insulation phase requ/rements <br /> Inspected by __ Date J <br /> P <br /> ❑ e .nvelope Floors shall be be Insulated without compression, and with supports <br /> ®R1p(Options 1, 11, III, IV, V) 0 R2(Options VI, VII) 24"O.C.to: <br /> ❑ ae)Non-vaulted, attic Collings shall be Insulated without compression to: <br /> OR-30(Options I, ll, III, IV, V, VII) Q R38 (Option VI) See Table 6-2 <br /> ❑ Ir Door systems shall maet:C U.40 (All options) <br /> Door typos are (1).- (2) <br /> Page 5 of 6 <br />