Laserfiche WebLink
CLOSED CH WORK ORDERS REPORT <br /> Total Utility Maii,tenance Management System Page 1 <br /> 11/12/1996 <br /> Date Range :01/09/1989 - 11/05/1996 <br /> CM Work Order Range : 1001091070001 - UT2600-02- Pattern :7101196750875 <br /> Item Range :<Blank> - WW22020001 <br /> Program ALL Function ALL Activity ALL --------- <br /> CM WORK ORDER ID: 7101196750875 Title: REPAIR 225 59TH PL SE <br /> <<DUPLICATE PRINTING OF THIS WORK ORDER>> <br /> Item ID: WS0184HO42 -- WATER SERVICE <br /> Location ID: -- Activit 675 <br /> Program 710 Function 119 y <br /> Date Completed: 10/16/1996 <br /> Overall Craft: Assigned to: <br /> Issued: 10/02/1996 Issued by: WMW <br /> Out of Service' NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs -- Cost--- <br /> _ ------------ ----------- ---------- <br /> UL CSG CAVttNAH, SHANE G 0.00 1.00 13 .07 <br /> WST WDT WALDEN, DAROLD T. 0.00 1 .00 20. 45 <br /> SUP1 WMW WARD, MICHAEL W. 0.00 1 .50 - 32 .87 <br /> Total Labor Cost: 66. 38 <br /> Materials: Date # Used Cost-------- -------- <br /> ID Description ---------- <br /> _ ________ -------------------------- <br /> ---- <br /> 30. 67 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 10/16/1996 1 --- /yam^ <br /> Total Material Cost: ( 30. 67 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------ <br /> ------------ ------------------------------ <br /> V2117 91 CHEV 1-TON HYD UNIT 1 .00 ------5_60 <br /> Total Vehicle Cost: 5.60 <br /> Work Description: <br /> ---------------------- <br /> ------------------------------------ <br /> METER #41908804 <br /> Total cost for work order 7101196750875: <br /> 102.66 <br />