Laserfiche WebLink
INSPECTION REPORT <br /> Address JAN A9j , PiL <br /> Contractor�2 £ �� <br /> 11 —t-- <br /> \ Owner c� <br /> Date <br /> APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact Inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION–24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector— Date �— <br /> e <br /> TYPE OF INSPECTION REQUESTED <br /> U Temp. Elecl. J Framing J Gas Piping <br /> U Footing J Drywall,Nailing J Consultation <br /> U Foundation J Shear Nailing J Groundwork <br /> U Ductwork J Grid J Struct. Slab <br /> U Wood Stove U Rough-In e.11-11inal <br /> U Masonry U Service J Insulation <br /> U Other — <br /> J BLDG:Pmt.No. �—/ ��U MECH:Pmt.No. <br /> O'f•tEC:Pmt. No..,5Q4sJ PLBG:Pmt.No. <br />