My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1218 59TH PL SW 2016-01-01 MF Import
>
Address Records
>
59TH PL SW
>
1218
>
1218 59TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 1:27:37 PM
Creation date
4/17/2017 1:27:32 PM
Metadata
Fields
Template:
Address Document
Street Name
59TH PL SW
Street Number
1218
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date 1-12'95 PuWho Werk$Pennile Q57o+5 <br /> Application For <br /> TO POSTING x ,95 Bldg DOW a 46734 <br /> PUBLIC WORKS PERMIT Public Works <br /> olel FeeFae S <br /> CS Lan Ae nee Pod S <br /> 8 � �hDue ua S <br /> Print or Type Only z 5i 1r8.� p8p 8 Gi (81 l* Ip8� 8 N �l <br /> N G <br /> or <br /> et N N <br /> Peter Reincke 12414 40th Ave Stn j%verett 98208 7 —1�8 <br /> Owner Mailing Addres \ CZPhone <br /> Owner ~ M Wag19g $ Ell6 <br /> Applicant Mailing Address City Zip Phone <br /> Describe Proposed Work <br /> new house t <br /> W <br /> Project Address lit known) 1218 59th Pl SW Lot 50 Merrill Crk Gardens L <br /> Attach four(4)copies of plans for proposed work• Draw to scale and note the following as applicable: <br /> • Property Lines • Centerline of street <br /> • Outline and dimensions of all existing and • Indicate North <br /> proposed structures on the lot • Show any proposed grading changes <br /> • Existing and proposed utilities • Show measurements <br /> DO NOT WRITE BELOW THIS LINE O <br /> PERMIT CONDITIONS <br /> 1.All calls for Inspection shall be made 24 his.in advance•phone 259.8810. <br /> 2.All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> &Call Lo"tiApetymNadla•tti0a aN NB:before you dig.TOLL FREE NUMBER 1.800.424.5555. <br /> S. curt( goner and sidewalk- in die plat are new wad undannaeed, any darnage thereto shall be replaced at the <br /> discretion of die Public Works Inspector. O <br /> 6 Any change in the driveway cut must be approved by thWorks inspector,Public WoInspector, Width at prop line <br /> lutdted to existing apron width. Driveway may taper giuduidly to nice( gavage door entrance(fur un <br /> approved 3 car garage). �.,. <br /> Adjust water boxes to erode 91 end of cobstroction. <br /> S. Driveways bball be completely clued before thiviilg un them. <br /> 9. Rooftop drainage sling be discharged to die lots infiltration trench as per die "Residential Roof Downspout O <br /> Systemud <br /> " detail (attached)and as per die sizing and loceden 'ortnation on die lot's site plan. A <br /> preconstrucdon mating must be schedided with ARM)Locke (388.9655 mob. or 259.8810 office)prior to <br /> installation of the infiltration system. Any change in the infiltration trench must be approved by the Public <br /> Works Irhfieclor. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harm- <br /> less the City of Everett from any and all claims for damages. costs, <br /> r/// �, ///••• expenses. or causes of action that may arise because of installation <br /> u G� and maintenance of the Improvement or other rlght•ol•way use hereto <br /> C applied for and further agrees to remove same upon notice from the <br /> Approved for <br /> Construction Date l y to pi blit property damaged thereby. <br /> Ut <br /> FINAL INSPECTION Q / Date <br /> Approved as Constructed SI a ure of Applicant Date <br /> PUBLIC WORKS DEPARTMENT WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br /> 3200 Cedar Street BE DAYS DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br /> livff Everett WA 98201 BE DILIGENTLY <br /> Y PURSUED TO COMPLETION.THIS PERMIT MAY BE <br /> Phone: WA 9810 CANCELLED BY THE CITY UPON ANY STOPPAGE&WORK ON THIS <br /> PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.