Laserfiche WebLink
INSPECTION REPORT <br /> Krrr Address/zz<�;' .�3— f <br /> Contractor <br /> Owner __ ���� <br /> Date <br /> APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADEbefore <br /> work can be approved. <br /> J Please contact inspector and arran a for a <br /> J Was not able to perform inspections ppomtmenl. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> Inspector. <br /> J Temp. Elect. TY ECTION REOUE TED <br /> J Footing n J Framing J Gas Piping <br /> ation <br /> J Foundation J SheDrywall, Nailing J Consult <br /> J Ductwo Shear Nailing J Groundwork <br /> J Wo love J Grid <br /> sonry J e J Struct. Slab <br /> J S <br /> J vServiceice <br /> J Final <br /> n J Other_ J Insulation <br /> BLDG:Pmt. / J MECH:Pmt.No.�_ <br /> J ELEC:Pmt. No. <br /> / T 17�� J PLBG:Pml. No. <br />