Laserfiche WebLink
INSPECTION REPORT/.� <br /> Address a <br /> Contractor—-_ — <br /> rJ/ Owner _. �.1� -- <br /> Date - <br /> APPROVAL J PARTIAL APPROVAL <br /> J CORRECTION REQUESTED <br /> J Corrections I.,led below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUWND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> t <br /> 47 <br /> V <br /> 1 , <br /> InspectDate O <br /> TYPE OF INSPECTION REQUESTED <br /> J Temp. Elect. U Framing J Gas Piping <br /> J Fooling U Drywall,Nailing J Consultation <br /> J Foundation U Shear Nailing J Groundwork <br /> J Ductwork �I Gdd J Struct.Slab <br /> •Wood Stove ough-in,/2&,W-1/-J Final <br /> J Masonry U Service J Insulation <br /> ❑Olher <br /> U BLDG:Pmt.No. U MECH:Pmt.No. <br /> U ELEC:Pmt.No. Ad<LBG:Pmt.No. � <br />