Laserfiche WebLink
❑8to 5-22-95 -Woraa Pnrmiie ��� •� <br /> TO POSTING <br /> Appllrblinn fo• '— - 0 <br /> _y ., pep, , s ._. <br /> PUBLIC WORKS PERMIT P1„'Tk*wkOIIFellFee <br /> jJ leu fool Fee Pam S <br /> Print or Type Only <br /> M <br /> Select Homes Inc 12 11 th Ave ve tt 82 13-9006 <br /> Owner A f line rresU �i p� Zip Phonr: <br /> Owner \)g � 2 � y IN iiln T <br /> Applicant Mnilinn Address City ------Zip Phone -- <br /> Describe Proposed Work _n@W�IOUBe.___�____—._____ <br /> t <br /> Project Address(if known) 1230 59th P_1_W _____Lot 53 Merrill Crk Gardens I _ _ _ I <br /> ! Attach tour(4)copies of plans for proposed work Diaw to aralr and note the following as applicabi, w <br /> t • Property Lines s Centerline of street <br /> • Outline and dimensions of all existing and • Indicate Nor.h v, <br /> proposed structures on the lot • Show any proposed grading changes <br /> • Existing and proposed utilities • Show measurements �A <br /> DO NOT WRITE BELOW THIS LINE 0 <br /> PERMIT CONDITIONS <br /> 1.All cells for inspection shall be made 24 bre.In advance•phone 259.8810. MM)2.All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> 4 3.Cell Location Underground Service 48 hrs.before you dig TOLL FREE NUMBER 1-800.424.5555. <br /> 4. Keep city streets clean at all times. <br /> 5. Curb gutter and sidewalk in the pint are new and undamaged, any damage thereto <br /> shall be replaeed at the discretion of the Public Works Inspector. <br /> 6. Any change in the driveway ct: must be approved by the Public Works Inspector, <br /> width at prop line limited to existing apron width. Driveway may taper gradually t <br /> meet garage door entrance (for an approved 3 car garage). 'w <br /> 7. Adjust water boxes to grade at end of construction. <br /> 8. Driveways shall be completely cured before driving on them. O <br /> 9. Rooftop drainage shall be discharged to the lots infiltration trench as per the <br /> "Residential Roof Downspout System" detail (attached) and as per the sizing and /'� <br /> location information on the lot's site plan. A preconstruction meeting must be li <br /> scheduled with Dennis Gableman (339-7403 mob. or 259-9810 office) prior to <br /> installation of the infiltration system. Any change in the infiltration trench must <br /> be approved by the Public Works Inspector. <br /> ,i n_ ACKNOWLEDGEMENT OF CONDITIONS <br /> YJ wdersigned owner/applicant hereby agrees to hold and save harm- <br /> -- - the Cdy of Everett from any and all claims for damages. costs <br /> andpenses <br /> mAint n causes of action that may other because of Installation <br /> I and maintenance of the improvement a other nght•ol•way use hereto <br /> applied for and further agrees to remove same upon notice from the <br /> Appro ed for Construction Dale C,ty dnd to replace public property damaged thereby. <br /> i <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant DT— <br /> PUBLIC WORKS DEPARTMENT WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br /> 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br /> 3200 Cedar Street BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE <br /> Everett,WA 98201 CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br /> Phone:259.8810 PROJECT OVER 90 DAYS DURATION. <br />