Laserfiche WebLink
K) M <br /> N <br /> 4i <br /> x <br /> H k <br /> � LA «� � <br /> � ( a <br /> pp �, Cx'l%' OV n1nB Deft. <br /> f] O N <br /> �q r April 17 , 1992 <br /> 03 <br /> O N <br /> N <br /> Mike Carrera <br /> planning <br /> City of Everett <br /> 3200 Cedar Strent <br /> Everett, WA 98201 <br /> RE: Revised Building Height-Plan 8410 <br /> Basic NuiT.ber 134 <br /> Dear Mr. Carrera: <br /> C3, On the above referenced plan we will adjust the over all building <br /> height as follows: <br /> 1 _ <br /> The 8/12 roof pitch will be reduced to 6.5/12. This <br /> will reduce the overall height from 29 .743' to 27 . 67 ' . <br /> This change will be incorporated on all 8418 plans in the powder <br /> Mill Highlands subdivision. <br /> SincerRly, <br /> 1 of y <br /> Ken Kooy / <br /> KK:J aw <br /> kk\wa utt.2ty <br /> �QQ�1 <br /> 11110 Bel-Red Hnad <br /> Bellevue, WA 98007 <br /> Thune (206) 641.2721 <br /> FAX (206) 6/3.3/76 <br />