Laserfiche WebLink
INSPECTION REPORT <br /> afig D <br /> Address �.�_... <br /> Contractor__CO V <br /> Owner 1 <br /> Date <br /> PPROVAL J PARTIAL APPROVAL <br /> IJ VIOLATION J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> �Pv sale � �_ <br /> 2��n .clee To —AL '� 16 14^lb <br /> Inspector - Date / <br /> 1 + <br /> OF INSPECTION REQUESTE <br /> J Temp.Ele . miming 'J Gas Piping <br /> J Footing U Drywall, Nailing J Consultation <br /> J Foundation J Shear Nailing J Groundwork <br /> J Duclwork J Grid J Struct.Slab <br /> J Wood Stove J Rough-in J Final ' <br /> J Masonry J Service 'J Insulation <br /> J Other_ _ <br /> ga[7LDG:Pmt. No. —��J MECH: Pmt.No. <br /> J CLEC:Pml. No._---__JJ PLBG: Pmt.No. <br /> N <br /> i <br /> 7i <br /> l <br /> i <br /> i <br /> ?ice <br />