My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2625 59TH ST SW 2016-01-01 MF Import
>
Address Records
>
59TH ST SW
>
2625
>
2625 59TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 2:32:45 PM
Creation date
4/17/2017 2:32:34 PM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
2625
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPIUNCE <br /> RE-0UINSPECIflF� <br /> APPROVED <br /> IMPORTANT: Please supply Information In the shaded boxes and chock the appropriate <br /> APPROVED PP Y <br /> circles.Dlsiogard topics that don't describe your building or equipment.DO NOT place <br /> checks In the two left columns. <br /> ye <br /> L <br /> ❑ ❑ ®Exterior slab Insulation, It not located on the Interior,shall be 13.10(Table 6.2). <br /> ❑ ❑ ®i Exterior slab Insulation, If present, shall approved for below grade use and protected above grade. <br /> ❑ a Wails,including rim joists,shall be Insulated wilhoutcompression to (Tablos•2) <br /> (JR-15 ball(Opt'ons I'll)' -013.19(Option til; VII) <br /> ❑ Inlerlor below grade walls shall be Insulated without compssion to (Table 8.2) <br /> OR-15(Options i,to '"ZR-19(Options III,IV;V;Vi,VII) ' <br /> ❑ o Vaulted ceilings shall be Insulated withoul oompresslon to R-30(Table 6-2;All options)... (; <br /> ❑ ©r Skylight wall Insulation Is Installed and equivalent to the required wall R•values above. <br /> ❑ z 'Vapor relardors shall be lnstolle¢"prl tlw,warm surface as reprosented below <br /> Select one option for floors,wales,aff appropriate coiAngs. <br /> <.Floors: Plywood W1 exterior gluePoly (z 4 MII),�Backed baits <br /> Walls: Poly plastic(a 4 M11) 0 Fa Oapted,backed bails `0 PVA paint - <br /> Ceilings: Not required where ventilation space averages>12'above insulation. <br /> Face stapled backed hails 0 Poly plastic(>4 m1l) " . 0 PVA paint <br /> ❑ ❑ l Healing system efficiency and sizing requirements shall be met as represented below: <br /> ❑ 13gHeat Pump efficiency shall be mot under the following compliants path{S.503 4): <br /> O Spilt system,air source heat pomp;HSPF i 6.8,COP>3.0 <br /> 0 Single package,air source heat pump:HSPF i.6.6, COP>3.0 <br /> 0 Water source heat pump:COP>_ 3.8 , <br /> 0 Ground source heal pump COP i 3.0 <br /> 02( ❑ s Central force-air furnace AFUE rating,as listed in the GAMA Directory,shall be: <br /> X., .78 (Options I, Ii,IV,VI,VII) 0 i .58 (Option III)) 0z74 (Option V) <br /> ❑ ❑ c Non-central,combustion heating systems shall have inlermilent ignition <br /> ❑ ❑ r Maximum healing system output (150%of design heal bad) Is STUmr. (S.503.2.2) <br /> ❑ [3 6 High efficiency forced-air furnace (s 56,000 BTU/hr.output)may may exceed 1500,'41 DHL <br /> because: OGAMA listed AFUE is,> 78+ 1 per each 5000 BTU/hr output that it exceeds the DHL. <br /> WSEC Insulation phase requirements: <br /> Inspected by Date <br /> ❑ QEnvelope Floors shall be Insulated without compression, and with supports 24'0.0.to:' <br /> XR19 (OpCrons I,II, ill, IV,V) OR25 (Options VI, VII) <br /> ❑ ©Non•vaulted,attic ceilings shall be Insulated without compression to: See Table 6-2 <br /> OR-30(Options 1,Il, III, IV,V. VII) 0 R38 (Option VO <br /> (� Q Door systems shall meet:,,X U.40(All options) <br /> Door types are <br /> C-LAQ.O 6 2.P <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.