Laserfiche WebLink
inal 28-Apr-92 ARCHITECTURAL 6 PLANNING CONSULTANTS, P.S. ' <br /> ling <br /> FM 4 Plan If 8318 Builder: MURRAY FRANKLYN COMPANIES <br /> :ate <br /> NORTHWEST ALUMINUM PRODUCTS, INC <br /> All frame types are aluminum(except Model 9130 is aluminum with thermal break) <br /> MIO. Model 0 625 825 121 328 720 9130 870 <br /> Air Space linchl 9/16 9/16 112 311 112 3/4 314 <br /> lion U Value 0.64 0.65 0.6 0.5.1 0.7 0.55 0.68 1.2 0.75 <br /> XOX SL.GL SKY SIDE FRNCII <br /> LOCATION Width Heiglu XO SH CAS FIX DOOR LIT GARD' LIT DOOR AREA A x U <br /> 987 <br /> Entry 1.00 3.50 1 4 4.2 <br /> ' R- Living Room 4.50 1.50 1 1 14 7.9 <br /> 4.50 4.00 1 18 9.5 <br /> 3lef 2.50 1.50 1 1 8 4.4 <br /> 2.50 4.00 10 5.3 <br /> Iled Dining Room 8.00 5.00 1 40 25.6 <br /> Nook 5.00 5.00 2 50 32 <br /> OF 6.00 6.83 1 41 28.7 <br /> Family Room 8.00 5.00 1 40 25.6 <br /> Powder Room 2.00 3.00 1 6 3.0 <br /> Den 6.00 4.00 1 24 15.4 <br /> afl- Matter Br 8.00 4.00 1 32 20.5 <br /> ng' Matter Bath 3.00 2.00 1 6 3.8 <br /> :led 5.00 2,00 1 10 5.3 <br /> ent 4.00 4.00 1 16 8.8 <br /> Of Bedroom 2 2.00 4.00 2 16 9.6 <br /> qs, 2.00 4.00 1 a 4.2 <br /> 1lIC Bedroom 3 1.67 3.50 2 12 6'2 <br /> 2.33 3.50 1 0 4.9 <br /> 5.67 2.00 1 11 6 <br /> Bedroom 4 6.00 4.00 1 24 15.4 <br /> 1115 Hall <br /> 4 2.2 <br /> ell Bath 2.00 2,00 <br /> Upper Entry 1.00 3.00 ' 6 3.2 <br /> 4.00 4.00 1 16 8.8 <br /> 0 0 <br /> 0 0 <br /> 0 0 <br /> 0 0 <br /> 0 0 <br /> p 0 <br /> TOTALS I1 0 3 11 1 3 0 1 0 424 261.3 <br /> • Gmdan window Is filled with moon. <br /> GLAZING PERCENTAGE CALCULATION WEIGHTED GLAZING CALCULATION <br /> 424 Total Glaring Total Glaring 424 <br /> 2505 Heated Flom Area Required U value (Option IVI 0.65 <br /> 16.93% Glaring Ratio Budget UA 275.6 <br /> Ta181 A x It 261.3 <br /> GLAZING RATIO MEETS 21% ALLOWANCE Savings 14'3 <br />