My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
730 59TH ST SW 2016-01-01 MF Import
>
Address Records
>
59TH ST SW
>
730
>
730 59TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 2:44:22 PM
Creation date
4/17/2017 2:44:16 PM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
730
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�E/vGt]001D <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> (05. Connect side sewer per City Standard#601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> U8 Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout Infiltration systern per City of Everett <br /> Storm Manual 3.2.6.2. Width_, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion contrc' measures per City of Everett Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the frc,r.+ property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewe•services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> i <br /> 2C. If a sewer pimp system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> / 211 A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 'wCanment9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.