Laserfiche WebLink
rnn �Y 0r^• L p ?-- ,y / <br /> everett INSPECTION REPORT <br /> eAddress <br /> Contractor 7- <br /> Owner <br /> Date <br /> TYPE OF INSPECTION REQUESTED <br /> Q�LDG: Pmt. No. 22'Z� 9 ❑ MECH: Pmt. No. <br /> ELEC: Pmt. No. O PLBG: Pml. No. <br /> ❑Temp. Elect. ❑ Framing ❑Gas Piping <br /> ❑ Footing ❑ Drywall,Nailing ❑Consultation <br /> ❑ Foundation ❑Shear Nailing 0 Groundwork <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑ Rough-In O Final <br /> Masonry ❑ S rvice n, S c. LL l 0<V i <br /> PROVALCJ ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> ❑Was not able to perform Inspection. <br /> O CALL 2598810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCC PANCY. <br /> S � <br /> C-Qvt-1O J2 !�a , r 112 r r <br /> r <br /> " V <br /> i <br /> i <br /> Inspector ,Date —�( <br />