Laserfiche WebLink
INSPECTION REPORT <br /> a <br /> Address ------ <br /> Contractor—/I�#--)-+--6-P--U-�/-�— <br /> Ile <br /> Owner <br /> Date----/o <br /> �AP J PARTIAL APPROVAL <br /> J VIOL J CORRECTION REQUESTED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspector and arrange for appointment. <br /> J was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION-24 hour notice required <br /> ON THE PREMISES ISSUED AND POSTED <br /> ES PRIOR TO OCCUPANCY. ` <br /> —Date 0100,40 6-47K <br /> Inspector ---- <br /> TYPE OF INSPECTION REQUESTED <br /> J Framing J Gas P. ing <br /> J Temp,Elect. J Drywall, Nailing J Consultation <br /> J FoolingJ Shear Nailing J Groundwork <br /> J Foundation <br /> tion J Grid Struct. Slab <br /> J Ductwork J Rough-in nal <br /> J Wood Stove J Service nsulauon <br /> JMasonry JOther__ ------- <br /> J BLDG:Pmt.No. _ — J MECH: Pmt.No. n--- <br /> - KBG:Foil,No. <br /> J ELEC:Pmt. No _ R <br />