Laserfiche WebLink
PaNSPECTION REPORT <br /> Address — 3/6 _ <br /> Contractor--J7--J� ,e n o <br /> Owner. r� <br /> Date - 0 <br /> U APPROVAL ❑ P TIAL APPROVAL <br /> O VIOLATION CORRECTION REQUESTED <br /> U Corrections listed below MUST BE MADE before work can be approved. <br /> U Please contact inspector and arrange for appointment. <br /> U Was not able to perform inspection. <br /> J CALL 259.8810 FOR REINSPECTION–24 hour notice required <br /> " A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> r ON THE PREMISES PRIOR TO OCCUPANCY. <br /> 1 � — <br /> Inspecto le _ <br /> T OF INSPECTION REOU TED <br /> J Temp. Elect. U Framing 'J Gasid <br /> J Fooling U Drywalr,Nailing J Conta (\` <br /> J Foundation U Shear Nailing J Gro <br /> J Ductwork U Grid J Struc1. St b <br /> J Wood Stave U Rough-in J Final <br /> J Masonry U Service isulation <br /> J Other <br /> NBLDG:Prof.No. _U MECH:Pml.No. _ <br /> U ELEC:Pmt.No. J PLBG:Pmt.No. <br /> i;, <br />